On Wednesday, the Toronto Parking Authority presented Bike Share Toronto’s 2026 annual operating plan. Several media outlets mainly reported on the new e-bike design, but there are several other things in store for the next four years. Let’s pedal along!
March 13, 2026
December 18, 2025
I Fought the Train and the … Train Won?
Toronto’s newest transit line in more than two decades – the Finch West LRT or Line 6 – opened on Sunday, December 7 to lots of criticism over its slow speeds with some trips taking more than one hour. One person – Mac Bauer a.k.a. 514runner – beat the LRT by 18 minutes while running! While Toronto City Council passed a motion this week to speed up the LRT including enabling full transit signal priority, I decided to ride the Finch West LRT to Humber College and return via bike share.
September 14, 2023
Community Bicycle Network with Adrian Currie
When it comes to cycling advocacy in Toronto, groups such as Cycle Toronto and Community Bikeways come to mind today. However, Toronto’s cycling advocacy story goes back further with Advocacy for Respect for Cyclists starting in 1996 (see my interviews with Geoff and Nancy), while Community Bicycle Networks (CBN) dates further back to 1993. CBN ran a community bike shop, a predecessor to today’s Bike Share Toronto, and hosted events like the Toronto Vintage Bicycle Show before shutting down in 2017. I spoke with Adrian Currie – who was on CBN’s board from 2002 to 2017 – to learn more.
March 06, 2023
Let's Talk Bike Share Toronto Pricing
There has been a lot of discussion within Toronto’s cycling community regarding the proposed 2023 Bike Share Toronto pricing which was approved at Friday’s Toronto Parking Authority meeting. Especially regarding the new 24 hour and single ride rates, as well as e-bike surcharges to discourage food couriers from hogging e-bikes. Cycle Toronto called for revisiting the e-bike surcharges and delaying the new pricing to allow for further study, while some users have considered switching to driving in protest of the per minute rates. Let’s take a look at the new rates, how they compare to those for BIXI Montréal, and suggest some improvements ahead of the March 20 Infrastructure & Environment Committee meeting.
April 20, 2022
Expanding the Micromobility Discussion
Last month, I got a BlueRev X8 e-scooter which convinced me on how e-scooters can be a great last mile solution and made getting to work a lot easier. However, Toronto upheld its ban on this micromobility solution back in May 2021. I would like to take a deeper dive into this topic and make the case for why Toronto should legalize the use of personally owned e-scooters. For this post, I would like to acknowledge Jamie Stuckless – owner of Stuckless Consulting and former Share The Road Executive Director – for contributing to this discussion.
July 22, 2019
What's Next, Bike Share Toronto?
July 10, 2019
Crossing Toronto’s Rubicon (a.k.a. The Humber)
- Initiate planning, design, and consultation to extend the Bloor Street bike lanes west from Shaw Street to High Park Avenue with implementation as early as Summer 2020.
- Report back in Spring 2020 on a detailed design for pilot bike lanes on Danforth Avenue from Broadview Avenue to Dawes Road.
- Study the feasibility of protected bike lanes on Bloor from Church Street to Avenue Road as part of the bike lane construction from Sherbourne to Church Streets (now expected in 2022).
April 11, 2018
A Pedal Powered Time Capsule
August 21, 2017
Summer 2017 Waterfront Roundup
July 05, 2016
June 2016 Toronto Cycling Updates
Last week brought some significant changes to Toronto’s cycling scene and the Bloor pilot project installation is still 1-2 months away.
February 12, 2016
Twelve Days of Bicycles – Twelve Tourists Touring
| Bicycle tour in Sint Maarten |





