August 29, 2019

The Value of Tactical Urbanism

For those who aren’t already aware, the term “tactical urbanism” refers to the use of temporary, low cost materials to help improve public spaces and neighbourhoods. The practice has been around for a long time, but this term has been popularized over the past few years including by Mikael Colville-Andersen during his TV series “The Life Sized City”. Last weekend, 8 80 Cities and Better Block took this concept to a whole new level by building a pop up complete street on Danforth Avenue known as 8 80 Streets Danforth; a first of its kind for Canada.

August 07, 2019

Observations Along the Humber

With the desire to escape the noise from the Caribbean Carnival on Saturday afternoon, I decided to bike the Humber River Trail all the way to Steeles and make some observations. A ride I used to do a few times before. This ride marked the first time I saw a deer while biking in Toronto, which happened south of Islington and Finch. A reminder of how cycling can lead to the most pleasant of surprises.

July 29, 2019

One Year Later – Where Are We On Protected Intersections?

Last year saw two cyclists killed in places where bike lanes intersected; those being Douglas Crosbie at Dundas and Jones in May and Dalia Chako at Bloor and St. George in June. Those fatalities helped spark new demands for Dutch style protected intersections from road safety advocates and the Toronto Star, while City Council approved ten “complete intersection” pilots. What happened on this file since then?
Cycle Toronto's protected intersection demo at Open Streets TO

July 22, 2019

What's Next, Bike Share Toronto?

Back in 2013, Toronto held the “Feeling Congested” consultation series to reduce gridlock and included a recommendation to expand Toronto’s bike share to 5,000 bikes. Earlier this month, this goal has been fulfilled with the newest of the 465 stations being installed in the Junction, Bloor West Village, the Beaches, East York, and Midtown. With this goal achieved, where should Bike Share Toronto go next?

July 10, 2019

Crossing Toronto’s Rubicon (a.k.a. The Humber)

Last month, Toronto’s Infrastructure and Environment Committee approved the bike plan update which would give city staff several actions related to the Bloor-Danforth corridor:
  1. Initiate planning, design, and consultation to extend the Bloor Street bike lanes west from Shaw Street to High Park Avenue with implementation as early as Summer 2020.
  2. Report back in Spring 2020 on a detailed design for pilot bike lanes on Danforth Avenue from Broadview Avenue to Dawes Road.
  3. Study the feasibility of protected bike lanes on Bloor from Church Street to Avenue Road as part of the bike lane construction from Sherbourne to Church Streets (now expected in 2022).

June 24, 2019

Back to the Bike Plan Drawing Board

This Thursday, Toronto’s Infrastructure and Environment Committee will review an update to the bike plan along with this year’s proposed cycling projects. The update effectively throws the bike plan approved in 2016 out the window; instead opting for more flexible three-year plans and a city-wide cycling network to be developed over the long term. What a slap in the face! Especially when you consider Toronto had a $16 million annual cycling budget (excluding federal and provincial funding) and five cycling fatalities in 2018, yet they built only 25 kilometres of on-street cycling infrastructure since 2016?!?!
The Bloor bike lanes need to be extended west from Shaw Street (pictured) to High Park

June 10, 2019

What's The Holdup, Danforth Bike Lanes?

With much of the cycling community’s focus on extending the Bloor bike lanes west to High Park, we cannot forget the need to extend the bike lanes east along Danforth Avenue. A complete streets study was announced at last year’s Bells on Danforth ride, but WTF has happened since then? Turns out there’s a lot going on with the east end’s main street.
Bells on Danforth 2018