Showing posts with label Danforth-Kingston 4 All. Show all posts
Showing posts with label Danforth-Kingston 4 All. Show all posts

December 23, 2024

The Year #BikeTO Got Flip Turned Upside Down

While trying to describe 2024 from a Toronto cycling perspective, the phrase "flip turned upside down" from Will Smith’s “Fresh Prince of Bel Air” song had come to mind. Especially considering the record number of cyclists killed and the Ford government’s passing of their anti-bike lane Bill 212 (which also calls for accelerating Highway 413 construction). Let’s recap 2024 to see why that was the case.

Winter conditions along the Sherbourne cycle track this afternoon

June 28, 2024

June 2024 Bloor Site Check (+ Danforth-Kingston Consultation)

The last time I visited Bloor Street in Etobicoke was during a bike count with Community Bikeways (TCBC) which also happened to be the first day of bike lane construction from Aberfoyle to Resurrection. Construction has largely wrapped up since then including the installation of barriers, so I thought I would use my day off work to join TCBC’s “Koffee on the Kingsway” at Café de Flore and check out the newly installed bike lanes.

June 07, 2024

Get Involved During Bike Month 2024!

Happy Bike Month to all who celebrate!

While I hope you enjoyed yesterday’s Bike to Work Day group commute – you can read Jun’s blog post about it here – there are a few things for Toronto’s cycling community to get involved with this month. These include the Oakridge Neighbourhood Streets Plan, the Avenue Road Study, complete street consultations for Trethewey and Danforth-Kingston, and the overall bike plan. Let’s take a quick look at these projects to see what they have to offer.

A throwback to the 2018 Bike to Work Day group commute from High Park

May 26, 2024

May 2024 Danforth-Kingston 4 All Ride

This morning, about 100 people made it out for today’s Danforth-Kingston 4 All ride in support of a safer Danforth Avenue and Kingston Road in Scarborough. It was a short four-kilometre slow roll from East Lynn Park to Scotia Parkette east of Warden Avenue. It was the first ride held in support of bike lanes on Danforth since COVID-19 pandemic and was made more urgent given the Danforth-Kingston project – originally proposed for the 2022-24 Bike Plan – was recycled into the one for 2025-27.

Here’s a photo of the ride when I first got to East Lynn Park.

March 26, 2024

March 2024 Public Consultation Overload

This year has been a crazy one when it comes to catching up on all the cycling related public consultations happening in Toronto. For this update, there are six consultations to review and a seventh we need to demand for. These six are the Wallace Emerson Neighbourhood Streets Plan, the Peanut Streets Plan, Steeles Avenue Eat Complete Streets, Steeprock-Bathurst Manor Cycling Connections, Beltline Gap Connections, and the Centennial Park Cycling Connections. Let’s dive in to see what they are all about!

February 29, 2024

A Call to Action for Scarborough

All right, folks! We need to talk about Scarborough’s dangerous streets.

On Sunday, February 11, a memorial ride was held for a 66-year-old female cyclist killed at Brimley & McNicoll. If that wasn’t bad enough, another crash in Scarborough this month killed a 47-year-old male cyclist on Monday near Birchmount & St. Clair. While it didn’t happen right on Birchmount – which had bike lanes removed in 2011 – the consequences of refusing to build safe streets still apply across Scarborough. Finally, despite the Danforth-Kingston complete street being part of the 2022-24 Bike Plan, there still has not been a public consultation held which had been delayed due in part to last year’s by-elections for Mayor and for Council in Scarborough Southwest.

Memorial ride held at Brimley & McNicoll on Sunday, February 11

January 06, 2024

Looking Back at the 2022-24 Bike Plan

When the 2022-24 Near-Term Cycling Implementation Plan was approved in December 2021, there was a call for 100 kilometres of new bike lanes during this time. Since then, about 13 kilometres was installed in 2022 and another 20 kilometres in 2023; the latter of which includes most of the Finch West LRT route. However, this still leaves the City 67 kilometres short with only one year left for this plan, while they have already started work on a replacement plan for 2025-27. Let’s look at what the key accomplishments were and what work remains on the table.

Map of bike lane installations from 2016 to 2023 with 2023's marked in blue

December 22, 2023

Two Wheeled Politics 2023 Reflection

With 2023 coming to a close, this means another annual reflection is in order. From bike lane fights on Midtown Yonge and Bloor West to Olivia Chow’s mayoral by-election win to some nice long distance trail riding, this year has been pretty crazy! Let’s get started, shall we?

The 4th Annual Cycling Good Cheer ride

March 15, 2023

Making Danforth and Kingston Safe for Everyone

Last summer, Bells on Kingston was formed to help build support for extending the Danforth bike lanes into Scarborough and along Kingston Road. They hosted a few group rides including feeder rides to Community Bikeways’ “Light Up Toronto” road safety rally on October 2 and “Cycling Good Cheer” ride on December 18. With stakeholder consultations under way and public consultations anticipated for this spring – along with those for Bloor West – it’s time to take the next step in establishing a 30-kilometre bikeway from Kipling Avenue to Scarborough Golf Club Road. The Danforth-Kingston Complete Street is expected to be done in two phases; first to St. Clair Avenue East and then to Scarborough Golf Club Road.

Phasing of Danforth-Kingston Complete Street Project (via City of Toronto)